Field descriptions: Time tracking line inquiry
This page describes the fields for the Time tracking line inquiry page. The fields in each section are listed in alphabetical order.
Field | Description |
---|---|
Completed |
Indicates if the resource has completed the operation sequence number. |
Operation number | The sequence number of the operation or stage of production in the routing. |
Operation status |
The current operation status or progress of the operation. Pending: The operation number is awaiting tracking. In progress: The operation number is tracked. Completed: The operation number is complete. Included: The operation number was unplanned and has been added. |
Operation tracking | The time tracking reference. |
Quantity | The quantity processed during the run time tracked for the operation sequence number. |
Resource ID | The code identifying the resource or resource group that will perform the production operation. |
Resource name | The individual resource name or the resource group name that performed the operation. |
Routing |
The routing name. |
Routing ID | The name of the stock item to build or maintain with the routing. |
Routing link |
The routing name and link to open the routing. |
Run time | The tracked time for performing the operation sequence number. |
Run time unit |
The unit of time used for the production costs calculations. |
Setup time | The tracked time for setting up the resource for the operation sequence number. |
Setup time unit |
The unit of time used for the production costs calculations. |
Site | The production site name. |
Site ID | The production site code. |
Time tracking link | The time tracking reference and link to open the time tracking document. |
Tracking date |
The time tracking effective date. This is the date the tracking was generated and the work order was updated with time tracked for it. |
Unit |
The released item stock unit. |
Work order | The work order reference. |
Work order link | The work order reference and link to open the work order document. |
Work order status |
The current work order status or progress of the work order. Pending: The work order is awaiting tracking. In progress: One or more components, operations, or released items are tracked for the work order. Completed: The work order is complete. All components, operations, and released items are tracked in full. Closed: The work order is complete. Production has ceased and the work order is closed. |
Tracking costs window
Displayed when you select the Costs icon for a line in the main list.
Field | Description |
---|---|
Amount | The total planned production cost. |
Cost |
The planned production cost per released item. |
Currency | The item-site currency. |
Date |
The tracking document posted date. |
Document | The tracking document reference and link to open the tracking document. |
Name | The stock item name. |
Quantity |
The tracked quantity of the item. |
Released item ID | The stock item code. |
Type | The tracking document type. |
Unit |
The released item stock unit. |
Work order | The work order reference. |