Field descriptions: Labor resource
This page describes the fields for the Labor resource page. The fields in each section are listed in alphabetical order.
General tab
Field | Description |
---|---|
Active | The switch to make the labor resource available or unavailable. For example, disabling a labor resource allows you to keep a track of people while they are on leave, or otherwise unavailable. |
Active from |
The dates when the labor resource becomes available and unavailable for work. |
Description | The description of the labor resource. For example, you can specify their role. |
ID | The labor resource ID. |
Name | The name of the person. |
Site |
The site where the person works or will work. |
Image block
A picture or graphic of the person.
Settings block
Field | Description |
---|---|
Efficiency | The efficiency in percentage of the labor resource based on the estimated downtime. The efficiency is used to calculate the effective time for operation for a Work order. |
Location |
The location where the operators work. Locations are defined on the Location page. |
Resource group |
The resource group the labor resource is linked to. For example, Chemical operators. Resource groups are defined on the Resource group page. |
Weekly capacity | The total weekly capacity of the labor resource in hours and minutes. The calculation is based on their weekly shift. For example, if the weekly shift is 5 days 2 X 4 hours, the weekly capacity is 40 hours 0 mins. |
Weekly shift |
The number of days the person works in each week and the number of hours they work each day. For example: 5 days 2 X 4 hours. The weekly shift is detailed in the Weekly shift details grid day by day after you select a value. Weekly shifts are set on the Weekly shift page. |
Weekly shift details block
The grid is a view of the weekdays when the operator works and the times of production. It is updated automatically for the selected weekly shift.
Field | Description |
---|---|
Capacity | The total daily work time. |
Daily shift | The daily shift. |
Day | The day of the week. |
Shift(n) | The different daily shifts. |
Capabilities tab
Field | Description |
---|---|
Service |
The service linked to the labor resource. For example: You can specify if the person has their first aid certificate, or if they are a financial or strategy consultant. This is for information only. |
Capability level |
The level of expertise of the operator. The level should reflect the expected behaviors, practices, and processes that are required to reliably and sustainably perform production operations. The capability levels are defined on the Capability level page. |
ID | The ID of the capability. |
Machine |
The machine the labor resource uses. Machines are defined on the Machine resource page. |
Name | The name of the capability. |
Start date End date |
The dates when the capability starts and ends. |
Tool |
The tool the labor resource uses. Tools are defined on the Tool resource page. |
Cost tab
Field | Description |
---|---|
Run | The direct cost of the operator when production is running, per cost unit. |
Cost category |
The cost category. Cost categories are managed on the Cost category page. |
Cost unit |
The cost unit such as day or hour. |
Indirect cost |
The indirect cost section associated with the resource. Indirect costs sections are defined on the Indirect cost section page. |
Setup |
The direct cost of the operator when setting up for production, per cost unit. |